Precision Training October 18 Pump Program
Event Date:
October 18, 2022
Event Time:
8:30 am
Event Location:
HPS North America, Inc.
Company Introductions 8:00 to 8:15
Why Pump? – Classroom 8:15 to 9:00
- Faster Installations while saving labor costs and increasing margin
- Hours vs. days / days vs. weeks / weeks vs. months
- Installer-friendly with proper training
- Easy set up and extremely mobile
- Vertical pumping capabilities – stay on the group floor, pump up to
60 feet vertically - 200 feet of hose including for long distance pumping
- Total – 45 minutes
Schönox Pump Program – Classroom 9:00 to 9:30
- Over 1 million square feet of successful installations
- 11 graco mp40 pumps strategically placed nationwide to minimize
freight cost and ensure quick delivery - Up to 2 days of training and oversite (fees are based on project
size) - Free rental options after the completion of a successful training
- Logistical consulting and experience
- Special package pricing for customers to purchase a pump
- Total – 30 minutes
Break – 10 mins
Introduction to the Machines – Classroom 9:40 to 10:40
- MP 40
- SL340E
- TMX1000
- Machine Specs
- Total – 1 hour
Break – 10 mins
Requirement for Pump Program – Classroom 10:40 to 11:20
- Logistics
- Power Requirements
- Water Requirements
- Crew Size
- Tooling
- What Schönox Provides
- What you need to provide
- Total – 40 minutes
Understanding the Machine MP40 – Practical 11:20 to 12:00
- Control Box overview
- Water Pump Overview
- Water Regulation Overview
- Rotor Stator Overview
- Understand entire machine components and how they work together to
help identify potential issues if they arise - Total – 40 minutes
Lunch – 12:00 to 1:00
Typical Jobsite Challenges and Issues: How to Handle – Classroom 1:00 to 1:30
- Maintaining good material mixes
- Lost Power
- Lost water pressure
- clogged hose
- machine lockup
- flush outs
- water temperature changes
- Total – 30 minutes
Machine Operation (Hands On) MP40 1:30 to 2:00
- Set Up
- Prime Machine
- Prime Hoses
- Adjust water
- Place Material
- Clean out
- Total – 30 minutes
Machine Operation (Hands On) SL340E 2:00 to 2:30
- Set Up
- Prime Machine
- Prime Hoses
- Adjust water
- Place Material
- Clean out
- Total – 30 minutes
Machine Operation (Hands On) TMX100 2:30 to 3:00
- Set Up
- Place Material
- Clean out
- Total – 30 minutes
Break – 15 minutes
Recap 45 minutes 3:15 to 4:00
Sorry, this event is expired and no longer available.